New PDF release: Online Scheduling in Manufacturing: A Cumulative Delay

Nonfiction 8

By Haruhiko Suwa

ISBN-10: 1447145607

ISBN-13: 9781447145608

ISBN-10: 1447145615

ISBN-13: 9781447145615

Online scheduling is famous because the an important decision-making technique of creation regulate at a section of “being in creation" in response to the published store flooring time table. on-line scheduling will be additionally regarded as one among key enablers to achieve advised capable-to-promise in addition to available-to-promise to clients in addition to decreasing construction lead instances lower than fresh globalized aggressive markets.

Online Scheduling in Manufacturing introduces new ways to on-line scheduling in response to an idea of cumulative hold up. The cumulative hold up is considered consolidated details of uncertainties less than a dynamic setting in production and will be accumulated continuously with out a lot attempt at any closing dates in the course of a agenda execution. during this strategy, the cumulative hold up of the agenda has the $64000 position of a criterion for you make a decision even if a time table revision is conducted. The cumulative hold up method of set off agenda revisions has the subsequent features for the sensible decision-making:

1. to lessen widespread time table revisions which don't unavoidably increase a present state of affairs with a lot cost for its operation;

2. to prevent overreacting to disturbances depending on strongly someone store flooring condition; and

3. To simplify the tracking strategy of a agenda status.

Online Scheduling in Manufacturing should be of curiosity to either practitioners and researchers who paintings in making plans and scheduling in production. Readers will locate the significance of when-to-revise guidelines in the course of a agenda execution and their impacts on scheduling results.

Show description

Read Online or Download Online Scheduling in Manufacturing: A Cumulative Delay Approach PDF

Best nonfiction_8 books

Download e-book for iPad: Online Scheduling in Manufacturing: A Cumulative Delay by Haruhiko Suwa

On-line scheduling is famous because the the most important decision-making strategy of construction keep an eye on at a section of “being in construction" based on the published store flooring agenda. on-line scheduling will be additionally regarded as one among key enablers to achieve recommended capable-to-promise in addition to available-to-promise to clients besides decreasing construction lead instances below fresh globalized aggressive markets.

Get Functional Programming, Glasgow 1991: Proceedings of the PDF

The Glasgow useful programming crew has held a workshop each one summer season given that 1988. the total crew, observed via a variety of associates from different associations, retreats to a delightful Scottish place for a couple of days. every body speaks in brief, bettering coherence, move­ fertilisation, and camaraderie in our paintings.

Download PDF by E. T. Jaynes (auth.), W. T. Grandy Jr., L. H. Schick (eds.): Maximum Entropy and Bayesian Methods: Laramie, Wyoming, 1990

The tenth foreign Workshop on greatest Entropy and Bayesian equipment, MaxEnt ninety, used to be held in Laramie, Wyoming from 30 July to three August 1990. This quantity includes the clinical shows given at that assembly. This sequence of workshops originated in Laramie in 1981, the place the 1st 3 of what have been to turn into annual workshops have been held.

Extra info for Online Scheduling in Manufacturing: A Cumulative Delay Approach

Sample text

Jackson JR (1956) An extension of Johnson’s results on job lot scheduling. Naval Res Logistics Q 3:201–203 58. Jain AK, Elmaraghy HA (1997) Production scheduling/rescheduling in flexible manufacturing. Int J Prod Res 35(1):281–309 59. Jain AS, Meeran S (1999) Deterministic job-shop scheduling: past, present and future. Eur J Oper Res 113:390–434 60. Jeong KC, Kim YD (1998) A real-time scheduling mechanism for a flexible manufacturing system: using simulation and dispatching rules. Int J Prod Res 36(9):2609–2626 61.

Springer Science+Business Media, New York 116. Pinedo M (2008) Scheduling—theory, algorithms, and systems. Springer, New York 117. Pruhs K, Sgall, J Torng E (2004) Online scheduling. In: Leung JY-T (ed) Handbook of scheduling scheduling—algorithms, models, and performance analysis. Chapman and Hall/CRC, Boca Raton, pp 15-1–15-39 118. Rajendran C (1999) Formulations and heuristics for scheduling in a Kanban flowshop to minimize the sum of weighted flowtime, weighted tardiness and weighted earliness of containers.

Springer, Berlin 138. Toksari MD (2011) A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs. Comput Oper Res 38(9):1361–1365 139. Uzsoy R, Lee CY, Martin-Vega LA (1992) A review of production planning and scheduling models in the semiconductor industry part I: system characteristics, performance evaluation and production planning. IIE Trans 24:47–60 140. Uzsoy R, Lee CY, Martin-Vega LA (1994) A review of production planning and scheduling models in the semiconductor industry Part II: shop-floor control.

Download PDF sample

Online Scheduling in Manufacturing: A Cumulative Delay Approach by Haruhiko Suwa


by Charles
4.5

Rated 4.92 of 5 – based on 11 votes