Horizontal and Vertical Drilling - download pdf or read online

Petroleum

By Byron Davenport

ISBN-10: 0070154910

ISBN-13: 9780070154919

Horizontal drilling is a comparatively new procedure for oil and fuel drilling on land. This targeted booklet bargains petroleum engineers complete therapy of horizontal drilling tools, plus an up to date overview of vertical drilling know-how. It covers every little thing from drilling contracts and good designs - to drilling gear, calculations, and checking out to the completing of a good and ultimate forms. incorporated are distinct directions for dealing with every kind of common and emergency difficulties encountered in drilling and comparable actions. there's assurance of plug and abandon strategies, blowout keep an eye on, scuffling with oil good fires, issues of safety for drilling and restoration, and instructions for dealing with unforeseen failures.

Show description

Read or Download Horizontal and Vertical Drilling PDF

Best petroleum books

Read e-book online Heterogeneous Catalysis in Organic Chemistry PDF

For the complex natural chemistry researcher who's getting into the glorious international of heterogeneous catalysis ordinarily - and heterogeneous hydrogenation particularly - there is not any unmarried source corresponding to this to advisor him. operating within the box of heterogeneous hydrogenation myself, I had felt glossy, updated, readable textual content was once lengthy late.

J. Záruba's Water Hammer in Pipe-Line Systems PDF

The actual rules of water hammer are defined during this quantity. the elemental mathematical tools of answer of water hammer and methods of proscribing its results are coated. particular description is given of the strategy of features and the corresponding courses for private desktops, which allows resolution of water hammer in a large choice of hydraulic platforms encountered in perform.

Download e-book for kindle: Reservoir sandstones by Robert R. Berg

Prentice corridor university Div, 1985. Hardcover. publication

New PDF release: Subsea Pipeline Engineering

«Subsea Pipeline Engineering» used to be the 1st of its sort, written by way of of the worlds Most worthy professionals in subsea pipeline engineering. within the upcoming moment version, those veterans have up to date their definitive reference booklet, protecting the whole spectrum of topics within the self-discipline, from direction choice and making plans to layout, development, deploy, fabrics and corrosion, inspection, welding, fix, danger evaluation, and acceptable layout codes and criteria.

Extra info for Horizontal and Vertical Drilling

Example text

On all dry hole AFE's the cost of plugging and abandoning must be considered. Figure two days rig cost to plug and abandon most wells. Call for a bid on cement services and base your cement on the amount of productive zones that may be encountered. For example, if the geology shows that you will go through four sands, then figure four plugs. The sands may all be wet but it is necessary in most states to plug all four to isolate each zone from the others. So you figure in four bottom plugs, one plug 100 ft out and one 100 ft in at the surface casing plus a 1a-sack plug at the surface.

Also make sure that an inspection report is available. If it is not, get a good inspection firm to inspect the drill string before it leaves the rental yard. One small piece of slag can mess up an MWD tool, and to see the effect, just calculate what it costs to pull a string for a piece of slag. A lot of bad pipe is in the field, so beware of too cheap a price. You get what you pay for in rental pipe. Along with the pipe, you will need all the handling tools and drill collars as well as heavy wate drill pipe.

Therefore, additional cement is needed at the seat to assure that the drilling operation will be successful if high pressure is encountered. So when drilling in southern Louisiana, always figure in one squeeze cementing job. 22 Chapter Two 23. Well-site supervision: Well-site supervision is easy to figure. First, figure five days for location building. Add the estimated days of the drilling operation. Then figure eight days for location clean-up, depending on the area. Some locations can be cleaned up in one or two days, but some take a week.

Download PDF sample

Horizontal and Vertical Drilling by Byron Davenport


by Richard
4.5

Rated 4.84 of 5 – based on 48 votes